Superfilm Metalized-6 Plant
A decision of sanction has been adopted in 2021 in order to produce the aluminum package coating for Superfilm Metalized-6 plant in Gaziantep, and it is an area with a total construction area of 1050 m2. By adopting the joint decisions with the enterprise, the main carrier has been designed as a steel construction, and a wall + double layer sheet metal cladding on the facade. The most remarkable area in the region is the reinforced concrete floor created with the various elevation differences in the region in which the machine settlement will be performed. Under the project, 71 tons of steel, and 910 m3 of concrete, 1050 m2 of roof and 593 m2 of facing work have been performed.
Read More
Project Tag
-
Project StatusIn progress
-
EmployerSüper Film Ambalaj A.Ş
-
Country CityTurkey, Gaziantep
-
Year of Construction2021-2022
-
Project Duration9 Month
-
Main ItemsSurvey, Expansion/Addition, Construction
-
Project DetailsIndustrial Facilities
Similar Projects
-
Akyel 1 and Akyel 2 Wind Power Plant Hybrid Solar Energy Power Plant (GES) Project
Karaman -
Koclu Hydroelectric Plant (HES) Regulator/ Power Plant Region Modification and New Construction Works
Giresun -
Cimko Cimento Adiyaman Branch Preheater Building Reinforcement Work
Adıyaman -
Flake Washing Facility Construction
Bursa -
Gazi-9 Wind Power Plant
Çanakkale -
Gaziantep Basak Traktor Solar Energy Power Plant (GES) Project
Gaziantep -
Guney-1 Wind power plant
Bursa -
ISKO14 Denim Weaving Building
Bursa -
POY Facility Construction
Bursa -
Sanko University Ahi Cafe Project
Gaziantep -
Sanko Adiyaman Solar Energy Power Plant (GES) Project
Adıyaman -
Sanko Tekstil Baspinar-1 Solar Energy Power Plant (GES) Project
Gaziantep -
Sanko Tekstil Baspinar-2 Solar Energy Power Plant (GES) Project
Gaziantep -
Sanko Tekstil Towel Solar Energy Power Plant (GES) Project
Gaziantep -
Isko Solar Energy Power Plant (GES)-1 Project
Bursa -
Sanko Tekstil Blue Collar Social Reinforcement Renovation
Adıyaman -
Super Film Solar Energy Power Plant-1 (GES-1) and Solar Energy Power Plant-2 (GES-2) Project
Gaziantep -
Sanko Superair Hangar Project
Gaziantep -
Cimko Cimento Taslica Ready Mixed Concrete Plant
Gaziantep -
Construction of ISKO Crisps Production Factory
Bursa -
Construction of Akyel 2 Hybrid SPP
Karaman -
Desa Deri Duzce SPP Project
Düzce -
Sanko Tekstil New Cotton Warehouse
Adıyaman -
Modification Works and Trench Works for Sanko Enerji Kalkandere HEPP Y4 Approach Tunnel
Rize -
Salihli Kurtulus Bazaar
Manisa -
Sanko Havlu Additional Building and Warehouse Project
Gaziantep -
Construction of Sanko Tekstil Cotton Warehouse
Adıyaman -
Superfilm Metalized 6 Warehouse Construction
Gaziantep -
Sanko Petrokimya Golovasi Port Facilities Phase-3 Wharf Construction
Adana -
Sanko Tekstil Isletmeleri San. Ve Tic. A.S
Adıyaman -
Sanko Tekstil Fiber Recycling Facility
Gaziantep -
Sanko Universitesi Hastanesi (Sanko University Hospital) Renovation Project
Gaziantep -
Akyel - 1 Hybrid SPP Project
Karaman -
Carchemish Ancient City Roofing Project
Gaziantep -
Kutnia Showroom Store
Gaziantep -
Sanko Holding Administrative Building
Gaziantep -
Sanko Tekstil Prefabricated Building Project
Adıyaman -
Sanko Enerji Koclu HEPP Guidance Wall
Giresun -
July 15 Temporary Housing Project
-
Sanko Tekstil Organized Industrial Zone (OSB) Region 4 Investment Project
Gaziantep -
Superfilm Administrative Building Renovation Project
Gaziantep
Related News