Koclu Hydroelectric Plant (HES) Regulator/ Power Plant Region Modification and New Construction Works

In the District of Yaglidere of Giresun; the fish pass, gravel pass, spillway with radial gate, flood weir, regulator transportation bridge and mechanical-electrical parts, as situated in the regulator region, have been disassembled, and any and all reinforced concrete foundations have been completely renewed together, and they have been re-constructed within a period of 117 days on a turnkey basis, and the regulator body has been made capable of keeping water for production. Similarly, in the forebay available in the regulator region, 6 wall panels have been completely renewed along with their foundations, and they have been constructed on a turnkey basis. The concrete and mats available in the areas, which require modification, of the berths, which have been built during construction of the power plant, have been disassembled and repaired through the welded wire fabric and shotcrete. 12000 m3 of concrete casting and 375 tons of iron installation has been performed under any and all of such works.  

Similar Projects
Related News