Sanko Adiyaman Solar Energy Power Plant (GES) Project

In the province of Adiyaman, a GES power plant with renewable energy source has been installed on the roofs, which have a total area of 132500 m2, of Sanko Tekstil Adiyaman Isletmeleri, which is one of our group companies, and the power plant has been commissioned upon acceptance thereof. The project, for which 37776 units of 400 Watt panels and 15.11 MWp of installed power are provided, is characterized with the largest GES project that has ever performed on the roof in Turkey. The plant, which will generate approximately 23 million kWh of energy annually, has been put into operation in less than 1 year, by taking into account the permission, project approvals and construction processes.  