Guney-1 Wind Power Plant Project consists of 14 wind turbines commissioned in the district of Karacabey of the Province of Bursa with a total installed power of 73.6 MW. The control building, the warehouse building, the turbine access roads, the turbine platform areas, the turbine foundation fabrications and the project access road, through which shipment of the turbine equipment is performed, has been constructed on a turnkey basis under the project. 

The Ministerial Acceptance of the last turbine has been completed on 15.10.2021 under the Guney-1 Wind Power Plant Project in which the first excavation has been performed on 08.07.2020. Within a period of 400 calendar days, the 14 turbine foundations, the building concretes and switch foundation concretes have been poured, and the reinforced concrete works have been completed, accordingly. Approximately 13800 m3 of concrete casting and 1280 tons of iron installation has been carried out during the course of project. 

Guney-1 Wind Power Plant has been put into operation in July 2021. It helps to reduce dependence of Turkey on the foreign energy needs through an annual renewable energy production of 189.8 million kWh. 

Similar Projects
Related News