• 6 6
    GAZİANTEP
    Sanko Tekstil Organized Industrial Zone (OSB) Region 4

    Shall be commissioned by Sanko Tekstil İşletmeleri San. Ve Tic. A.Ş. and will serve as 100 t/g cotton.

    Review Project
    GAZİANTEP
    Sanko Tekstil Organized Industrial Zone (OSB) Region 4

    Shall be commissioned by Sanko Tekstil İşletmeleri San. Ve Tic. A.Ş. and will serve as 100 t/g cotton.

    Review Project
  • 1 1
    KARAMAN
    Wind Power Plant Hybrid Solar Energy Power Plant

    It consists of the work for installation of the Solar Energy Power Plant (GES) with renewable energy source on a total of 750000 m2 of land in a manner to be 40 MW for Akyel-1 and 10 MW for Akyel-2 in order to establish

    Review Project
    KARAMAN
    Wind Power Plant Hybrid Solar Energy Power Plant

    It consists of the work for installation of the Solar Energy Power Plant (GES) with renewable energy source on a total of 750000 m2 of land in a manner to be 40 MW for Akyel-1 and 10 MW for Akyel-2 in order to establish

    Review Project
  • 2 2
    GİRESUN
    Koclu Hydroelectric Plant (HES) Regulator

    In the District of Yaglidere of Giresun; the fish pass, gravel pass, spillway with radial gate, flood weir, regulator transportation bridge and mechanical-electrical parts.

    Review Project
    GİRESUN
    Koclu Hydroelectric Plant (HES) Regulator

    In the District of Yaglidere of Giresun; the fish pass, gravel pass, spillway with radial gate, flood weir, regulator transportation bridge and mechanical-electrical parts.

    Review Project
  • 3 3
    ADIYAMAN
    Preheater Building Reinforcement Work

    It consists of the work of reinforcement of the 4-cyclone preheater building, which operates within the Adiyaman Branch of Cimko Cimento, and whose construction has been completed in the early 1980s.

    Review Project
    ADIYAMAN
    Preheater Building Reinforcement Work

    It consists of the work of reinforcement of the 4-cyclone preheater building, which operates within the Adiyaman Branch of Cimko Cimento, and whose construction has been completed in the early 1980s.

    Review Project
  • 4 4
    ÇANAKKALE
    Wind Power Plant

    Gazi-9 Wind Power Plant Project consists of 14 wind turbines commissioned in the district of Bayramic of the Province of Canakkale with a total installed power of 74.2 MW.

    Review Project
    ÇANAKKALE
    Wind Power Plant

    Gazi-9 Wind Power Plant Project consists of 14 wind turbines commissioned in the district of Bayramic of the Province of Canakkale with a total installed power of 74.2 MW.

    Review Project
  • 5 5
    ADANA
    Sanko Petrokimya Golovasi Port Facilities Phase-3 Wharf Construction

    At SANKO Golovası Port Facilities in the District of Yumurtalik of the Province of Adana, in order to increase the capacity of the load wharf, which is used currently, the length of the wharf has been extended by 359 m in total.

    Review Project
    ADANA
    Sanko Petrokimya Golovasi Port Facilities Phase-3 Wharf Construction

    At SANKO Golovası Port Facilities in the District of Yumurtalik of the Province of Adana, in order to increase the capacity of the load wharf, which is used currently, the length of the wharf has been extended by 359 m in total.

    Review Project
  • 7 7
    GAZİANTEP
    Sanko Holding Management Building

    The Holding Building project, which is designed to be constructed at the Locality of Erikce of the Province of Gaziantep, is designed to move the head office, as situated in the location of Gazikent, to this region.

    GAZİANTEP
    Sanko Holding Management Building

    The Holding Building project, which is designed to be constructed at the Locality of Erikce of the Province of Gaziantep, is designed to move the head office, as situated in the location of Gazikent, to this region.

    Projects
    Projects
    Our Activity Areas
    Our Activity Areas