-
GAZİANTEPSanko Tekstil Organized Industrial Zone (OSB) Region 4
Shall be commissioned by Sanko Tekstil İşletmeleri San. Ve Tic. A.Ş. and will serve as 100 t/g cotton.
Review ProjectGAZİANTEPSanko Tekstil Organized Industrial Zone (OSB) Region 4Shall be commissioned by Sanko Tekstil İşletmeleri San. Ve Tic. A.Ş. and will serve as 100 t/g cotton.
Review Project -
KARAMANWind Power Plant Hybrid Solar Energy Power Plant
It consists of the work for installation of the Solar Energy Power Plant (GES) with renewable energy source on a total of 750000 m2 of land in a manner to be 40 MW for Akyel-1 and 10 MW for Akyel-2 in order to establish
Review ProjectKARAMANWind Power Plant Hybrid Solar Energy Power PlantIt consists of the work for installation of the Solar Energy Power Plant (GES) with renewable energy source on a total of 750000 m2 of land in a manner to be 40 MW for Akyel-1 and 10 MW for Akyel-2 in order to establish
Review Project -
GİRESUNKoclu Hydroelectric Plant (HES) Regulator
In the District of Yaglidere of Giresun; the fish pass, gravel pass, spillway with radial gate, flood weir, regulator transportation bridge and mechanical-electrical parts.
Review ProjectGİRESUNKoclu Hydroelectric Plant (HES) RegulatorIn the District of Yaglidere of Giresun; the fish pass, gravel pass, spillway with radial gate, flood weir, regulator transportation bridge and mechanical-electrical parts.
Review Project -
ADIYAMANPreheater Building Reinforcement Work
It consists of the work of reinforcement of the 4-cyclone preheater building, which operates within the Adiyaman Branch of Cimko Cimento, and whose construction has been completed in the early 1980s.
Review ProjectADIYAMANPreheater Building Reinforcement WorkIt consists of the work of reinforcement of the 4-cyclone preheater building, which operates within the Adiyaman Branch of Cimko Cimento, and whose construction has been completed in the early 1980s.
Review Project -
ÇANAKKALEWind Power Plant
Gazi-9 Wind Power Plant Project consists of 14 wind turbines commissioned in the district of Bayramic of the Province of Canakkale with a total installed power of 74.2 MW.
Review ProjectÇANAKKALEWind Power PlantGazi-9 Wind Power Plant Project consists of 14 wind turbines commissioned in the district of Bayramic of the Province of Canakkale with a total installed power of 74.2 MW.
Review Project -
ADANASanko Petrokimya Golovasi Port Facilities Phase-3 Wharf Construction
At SANKO Golovası Port Facilities in the District of Yumurtalik of the Province of Adana, in order to increase the capacity of the load wharf, which is used currently, the length of the wharf has been extended by 359 m in total.
Review ProjectADANASanko Petrokimya Golovasi Port Facilities Phase-3 Wharf ConstructionAt SANKO Golovası Port Facilities in the District of Yumurtalik of the Province of Adana, in order to increase the capacity of the load wharf, which is used currently, the length of the wharf has been extended by 359 m in total.
Review Project -
GAZİANTEPSanko Holding Management Building
The Holding Building project, which is designed to be constructed at the Locality of Erikce of the Province of Gaziantep, is designed to move the head office, as situated in the location of Gazikent, to this region.
GAZİANTEPSanko Holding Management BuildingThe Holding Building project, which is designed to be constructed at the Locality of Erikce of the Province of Gaziantep, is designed to move the head office, as situated in the location of Gazikent, to this region.